Anita Garg filed a consumer case on 11 Dec 2017 against Unitech Limited in the StateCommission Consumer Court. The case no is CC/480/2017 and the judgment uploaded on 13 Dec 2017.
Chandigarh
StateCommission
CC/480/2017
Anita Garg - Complainant(s)
Versus
Unitech Limited - Opp.Party(s)
Rajesh Girdhar,Adv.
11 Dec 2017
ORDER
STATE CONSUMER DISPUTES REDRESSAL COMMISSION,
U.T., CHANDIGARH
Complaint case No.
:
480 of 2017
Date of Institution
:
12.06.2017
Date of Decision
:
11 Dec. 2017
Mrs.Anita Garg wife of Late Sh.Vijay Kumar Garg, resident of House No.1232, Phase 3B2, Mohali.
Late Mr.Vijay Kumar Garg son of Sh.Sehaj Ram Garg, resident of House No.1232, Phase 3B2, Mohali, through his LR’s.
Mrs.Anita Garg wife of Late Sh.Vijay Kumar Garg, resident of House No.1232, Phase 3B2, Mohali.
Navya Garg daughter of Late Sh.Vijay Kumar Garg, resident of House No.1232, Phase 3B2, Mohali.
Urvee Garg of Late Sh.Vijay Kumar Garg, resident of House No.1232, Phase 3B2, Mohali.
…… Complainants
V e r s u s
Unitech Limited, through its Managing Director, Office at SCO No.189-90-91, Sector 17-C, Chandigarh.
Unitech Limited through its Managing Director, Office at 6, Community Centre, Saket, New Delhi-110017.
M/s Alice Developers Private Limited, Registered Office at 6, Community Centre, Saket, New Delhi, through its Managing Director.
…..Opposite parties
Complaints under Section 17 of the Consumer Protection Act, 1986
BEFORE: JUSTICE JASBIR SINGH (RETD.), PRESIDENT.
MR.DEV RAJ, MEMBER.
MRS.PADMA PANDEY, MEMBER
Argued by:- Sh.Abhishek Bhateja, Advocate for the complainants.
Mrs.Vertika H.Singh, Advocate for opposite parties no.1 and 2.
Opposite party no.3 exparte.
PER MR.DEV RAJ, MEMBER
Vide our separate detailed order of the even date, recorded in consumer complaint bearing no.469 of 2017 titled as Sumit Dhingra Vs. Unitech Limited and ors. this complaint has been partly accepted with costs.
Certified copy of the order passed in consumer complaint bearing No. 469 of 2017 shall also be placed on this file.
Certified copies of this order, alongwith the main order passed in consumer complaint bearing No. 469 of 2017, be sent to the parties, free of charge.
The file be consigned to Record Room, after completion.
Sd/- Sd/- Sd/-
(DEV RAJ)
MEMBER
(JUSTICE JASBIR SINGH (RETD.))
PRESIDENT
(PADMA PANDEY)
MEMBER
Rg.
STATE CONSUMER DISPUTES REDRESSAL COMMISSION,
U.T., CHANDIGARH
Complaint case No.
:
469 of 2017
Date of Institution
:
06.06.2017
Date of Decision
:
11 Dec. 2017
Sumit Dingra son of Sh.Rajinder Kumar, resident of House No.414, Sector 4, Panchkula, Haryana.
…… Complainant
V e r s u s
Unitech Limited, through its Chairman Sh.Ramesh Chandra, having Registered Office at 6, Community Centre, Saket, New Delhi-110017.
Sh.Ramesh Chandra, Chairman of Unitech Limited, having Registered Office at 6, Community Centre, Saket, New Delhi-110017.
Unitech Limited, through its Director Sh.Sanjay Chandra, having its Marketing Office at SCO No.189-90-91, Sector 17/C, Chandigarh.
Sh.Sanjay Chandra, Director of Unitech Limited, having its Marketing Office at SCO 189-90-91, Sector 17/C, Chandigarh.
Alice Developers Private Limited, through its Director Sanjiv Hingorani, having Registered Office at Basement, 6, Community Centre, Saket, New Delhi-110017.
Sanjiv Hingorani, Director of Alice Developers Private Limited, through its Director Sanjiv Hingorani, having Registered Office at Basement, 6, Community Centre, Saket, New Delhi-110017.
…..Opposite parties
Argued by:- Sh.Sanjeev Sharma, Advocate for the complainant.
Mrs.Vertika H.Singh, Advocate for opposite parties no.1, 3 and 4.
Sarabjit Kaur wife of S.Joga Singh, resident of House No.4204, Sector 68, Mohali.
…… Complainant
V e r s u s
Unitech Limited, Real Estate Division (Marketing) 5th Floor, Tower A, Signature Towers, South City 1, NH-8, Gurgaon, through its Managing Director, Ajay Chandra and Sanjay Chandra.
Ajay Chandra, Managing Director of Unitech Limited, Real Estate Division (Marketing) 5th Floor, Tower A, Signature Towers, South City 1, NH-8, Gurgaon.
Sanjay Chandra, Managing Director of Unitech Limited, Real Estate Division (Marketing) 5th Floor, Tower A, Signature Towers, South City 1, NH-8, Gurgaon
Alice Developers Private Limited, Registered Office at Basement, 6, Community Centre, Saket, New Delhi, through its Director, Sanjeev Hingorani and Satbir Singh.
Sanjeev Hingorani, Director of Alice Developers Private Limited, Registered Office at Basement, 6, Community Centre, Saket, New Delhi.
Satbir Singh Yadav, Director of Alice Developers Private Limited, Registered Office at Basement, 6, Community Centre, Saket, New Delhi.
…..Opposite parties
Argued by:- Ms.Jaideep Kaur, Advocate proxy for Sh.Jasminder Singh Thind, Advocate for the complainant.
Mrs.Vertika H.Singh, Advocate for opposite parties no.1 to 3.
Opposite parties no.4 to 6 exparte.
Complaints under Section 17 of the Consumer Protection Act, 1986
BEFORE: JUSTICE JASBIR SINGH (RETD.), PRESIDENT.
MR.DEV RAJ, MEMBER.
MRS.PADMA PANDEY, MEMBER
PER MR.DEV RAJ, MEMBER
By this order, we propose to dispose of the aforesaid three consumer complaints. Arguments were heard in common, in the said cases, as the issues involved therein, except minor variations, here and there, of law and facts are the same. In all the three complaints, the complainants have sought refund of the amount paid towards respective units, alongwith interest, compensation etc. At the time of arguments, on 05.12.2017, it was agreed between the contesting parties, that, in view of above, all the three complaints can be disposed of, by passing a consolidated order.
Under above circumstances, to dictate order, facts are being taken from consumer complaint bearing no.469 of 2017 titled as Sumit Dhingra Vs. Unitech Limited and ors. It is case of the complainant that despite the fact that he had paid Rs.42,07,930/- (infact Rs.40,12,930/- as admitted during arguments), he was not delivered possession of apartment bearing no.A2-02-0203 (3 Bedroom), Block A2, measuring 137.96 square mtrs., purchased by him, from the opposite parties, in their project namely, ‘Gardens’, Uniworld City, Sector 97, Mohali, Punjab, for want of construction and basic amenities, whereas, vide Agreement dated 08.02.2011 executed between the parties, they (opposite parties), promised to deliver the same by 07.02.2014. It was specifically stated that number of visits were made by the complainant, at the site, as well as the office of the opposite parties, to know, as to when possession of the unit, in question, will be delivered to him, after completing the construction and basic amenities, but they kept on giving bald assurances. It was further stated that, as on today, there is no likelihood of completion of construction of the unit, in question, including the basic amenities, as such, the question of delivering possession thereof, in the near future did not at all arise. It was further stated that the opposite parties are also not in possession of necessary permissions/sanctions to launch the said project. Number of letters written to the opposite parties, in the matter, also did not yield any result. Request made to refund the amount paid alongwith interest was also not acceded to, by the opposite parties. It was further stated that the aforesaid acts of the opposite parties, amounted to deficiency in providing service and adoption of unfair trade practice. Hence this complaint alongwith connected complaints have been filed by the complainant(s), seeking refund of the amount paid towards their respective units, alongwith interest, compensation and litigation expenses.
Notice in this complaint was issued on 15.06.2017, for 18.07.2017. On 15.06.2017, Mrs.Vertika H.Singh, Advocate, was present in this Commission to represent opposite parties no.1 to 4, in some other case. On our asking, she accepted notice of this complaint, on behalf of opposite parties no.1, 3 and 4 and undertook to file vakalatnama, as also reply and evidence, on their behalf, on the next date of hearing. On 18.07.2017, as per office note, report qua notice sent to opposite parties no.5 and 6 through registered post on 20.06.2017, was not received back. As such, the complaint was adjourned to 10.08.2017, to await service of opposite parties no.5 and 6. On the said date, despite deemed service, when none put in appearance on behalf of opposite parties no.5 and 6, they were proceeded against exparte, by this Commission, by invoking the provisions of Regulation 10 (2) of the Consumer Protection Regulations 2005.
Later on Mrs.Vertika H. Singh, Advocate filed her vakalatnama, only on behalf of Opposite parties no.1, 3 and 4. Joint written statement was also filed on their behalf only. As such, when none put in appearance on behalf of opposite party no.2, despite giving him number of opportunities, he was also proceeded against exparte, vide order dated 06.09.2017.
In the joint written statement, filed by opposite parties no.1, 3 and 4, factual matrix of the case was not seriously disputed. However, an attempt has been made to wash of their hands, by stating that Buyer’s Agreement dated 08.02.2011 was executed between the complainant and opposite parties no.5 and 6. It was stated that as per Developer’s Agreement, opposite parties no.5 and 6 were to construct the units and hand over possession thereof, to the purchasers including the complainant. It was further stated that as opposite parties no.5 and 6 have failed to do so, no liability can be imposed upon opposite parties no.1, 3 and 4. Territorial jurisdiction of this Commission was challenged by stating that Buyer’s Agreement was signed at New Delhi; unit is located in the project at Mohali, Punjab; and also all the payments which were received at Chandigarh office, via cheques, were forwarded to Delhi/Gurgaon Office of the opposite parties. Pecuniary jurisdiction of this Commission was also challenged. It was further stated that the complainant being investor, would not fall within definition of consumer, as defined under Section 2 (1) (d) of the Consumer Protection Act, 1986. It was further stated that opposite party no.4 who is Managing Director/Director of the Company/Unitech Limited, has wrongly been impleaded as party to the complaint, in his personal capacity.
On merits, it was admitted that the complainant had purchased the residential unit, in question, in the said project. It was not disputed that as per condition no. 4.a.(i) of the Agreement, possession of the fully developed unit, was to be delivered to the complainant within a period of 36 months, from the date of execution of the same (Agreement). It was further stated that the said period was extendable and till such time, the sale deed is executed, the builder was to remain owner of the property, in question. It was further stated that the complainant had deposited an amount of Rs.40,12,930/- and not Rs.42,07,930/-, as claimed by him, in his claim, as the amount of Rs.1 lac paid vide cheque dated 17.02.2011 and Rs.95,000/- vide cheque dated 17.05.2012, were returned to him. This fact was admitted by Counsel for the complainant, during arguments. Fact qua price of the unit, as mentioned in the complaint was not controverted. It was further stated that Chandigarh Office of opposite parties no.1, 3 and 4 was providing various facilities to the purchasers, including the complainant, on behalf of opposite parties no.5 and 6. Amount collected from the complainant, was deposited in the designated account of opposite parties no.5 and 6. It was further stated that opposite parties no.5 and 6 were authorized to use Unitech Trade Mark and Corporate Logo, of opposite parties no.1, 3 and 4, for various purposes, such as promotional, marketing, advertisements etc. It was further stated that the dispute being a contractual one, consumer complaint is not maintainable, and only a Civil Court, could adjudicate the same. It was further stated that infact the complainant should have filed recovery suit, to recover the amount paid towards the said unit. It was further stated that delay in construction of unit(s) in the said project occurred on account of force majeure circumstances, for which the developer was entitled to reasonable extension of time for delivery of possession of the unit, on account of force majeure circumstances. It was further stated that in terms of Clause 2 (e) of the Agreement, in case, the buyer cancels the allotment, and/or seeks refund of the amount deposited, the developer was at liberty to forfeit the booking/earnest amount, out of the deposited amount, as the case may be. It was further stated that since they were opposite parties no.5 and 6, which were to construct the units and deliver possession of the same, as such, no liability can be fastened upon opposite parties no.1, 3 and 4, as they were only the confirming parties and had a very limited role. It was further stated that opposite parties no.1, 3 and 4 had no liability to make refund of the amount deposited. It was further stated that all necessary approvals/sanctions had been obtained from the Competent Authorities, as far as the project, in question, is concerned. It was further stated that, delay, if any, took place, is solely attributable to the Punjab State Power Corporation Limited (PSPCL) and Greater Mohali Area Development Authority (GMADA), as it took a long time for granting approval to provide electricity in the project. It was further stated that, now the electricity is provided at the site; all the basic amenities including the construction work of the unit are complete and the opposite parties had already applied for completion certificate vide letter dated 03.02.2016. It was further stated that the complaint filed is beyond limitation. The remaining averments are denied, being wrong. It is prayed that the complaint having no substance, be dismissed.
Rejoinder was filed only in consumer complaint bearing no.480 of 2017, wherein, all the averments contained in the complaint were reiterated and those of opposite parties no.1 and 2/Unitech Limited were repudiated.
The contesting parties, led evidence in support of their cases and also raised arguments in terms of pleadings noted in earlier part of this order, which were heard, in detail.
The first question, that falls for consideration, is, as to whether, the complainant is a speculator, and that he has purchased the unit, in question, for earning profits i.e. for resale, as and when there is escalation in the prices of real estate, therefore, he would not fall within the definition of consumer, as defined by Section 2 (1) (d) (ii) of the Act, as alleged by opposite parties no.1, 3 and 4. It may be stated here that there is nothing, on record to show that the complainant is the property dealer and is indulged in sale and purchase of property, on regular basis. In para no.2 of the complaint, supported by his affidavit, it has been specifically stated by the complainant that the unit, in question was purchased by him, for his residential purpose. Thus, in the absence of any cogent evidence, in support of the objection raised by opposite parties no.1, 3 and 4, mere bald assertion to that effect, cannot be taken into consideration. In a case titled as Kavita Ahuja Vs. Shipra Estate Ltd. and Jai Krishna Estate Developer Pvt. Ltd. 2016 (1) CPJ 31, by the National Consumer Disputes Redressal Commission, New Delhi, it was held that the buyer(s) of the residential unit(s), would be termed as consumer(s), unless it is proved that he or she had booked the same for commercial purpose. Similar view was reiterated by the National Commission, in DLF Universal Limited Vs Nirmala Devi Gupta, 2016 (2) CPJ 316. The principle of law, laid down, in the aforesaid cases, is fully applicable to the present case. The complainant, thus, falls within the definition of a ‘consumer’, as defined under Section 2(1)(d) of the Act. Such an objection, taken by opposite parties no.1, 3 and 4 in their written reply, therefore, being devoid of merit, is rejected.
The next question, that falls for consideration, is, as to whether, this Commission has got territorial Jurisdiction, to entertain and decide the complaint, or not. According to Section 17 of the Act, a consumer complaint can be filed by the complainant, before the State Consumer Disputes Redressal Commission, within the territorial Jurisdiction whereof, a part of cause of action arose to him. In the instant case, it is evident from contents of the Buyer’s Agreement, that it has specifically been stated that the Company i.e. Unitech is a Public Limited, having its Marketing Office at Unitech Limited, SCO 189-90-91, Sector 17C, Chandigarh. It has also come on record that at one point of time, account statement/customer ledger Annexure C-5 pertaining to the unit of the complainant was issued by Marketing Office of the Company, at Chandigarh, at it bears the address of Chandigarh Office of the opposite parties. Furthermore, it is also evident, that cheques for various amounts (at pages 59 to 69) towards price of the said unit, were also received by Regional Office of opposite parties no.1, 3 and 4 at Chandigarh, as the same bore their address as Regional Office, SCO 189-191, Sector 17-C, Chandigarh-160017. Not only this, it has been candidly admitted by opposite parties no.1, 3 and 4, in their joint written reply that they had received payment towards price of the said unit, from the complainant. If that is so, it can safely be said that the Marketing Office of the Company at Chandigarh, was actively playing a significant role, in respect of the transaction in question, meaning thereby that it was actually carrying on business for gains, from Chandigarh. Under these circumstances, it can very well be said that this Commission, at Chandigarh, has territorial jurisdiction, to entertain and decide this complaint, in view of Section 17 (2) (a) (b) and (c) of the Act.
Not only as above, since it has been proved on record that Marketing office of the Company is located at Chandigarh and the fact that the details of the project were given to the complainant, from that office only, meaning thereby that the project was marketed from Chandigarh; in that case also, this Commission has territorial jurisdiction to entertain and decide this complaint, in view of law laid down by the Hon’ble Supreme Court of India in State of Punjab Vs. Nohar Chand, 1984 SCR (3) 839, in which it was held that the Court(s), in whose Jurisdiction, products/goods are marketed, will have the territorial Jurisdiction to entertain and decide a complaint. Not only as above, similar findings were given by the National Commission, in a case titled as Parsvnath Developers and anr. Vs. Som Nath Sharma and 2 ors., First Appeal No.1613 of 2016, decided on 21.03.2017. Relevant contents of the said order read thus:-
“Regarding the question of territorial jurisdiction, the some part of cause of action accrues in Delhi as the agreement was signed at New Delhi. The payment was received at Panchkula in the office of OPs 1 to 3. Similar issue was decided by this Commission in the case of Ravinder Kumar Bajaj vs. Parsvnath Developers Pvt. Ltd. & Ors., first appeal No. 515 of 2016 decided on 23.08.2016 qua same very builder. It was held that “officers of opposite parties no. 1 to 3 sitting in Branch Office at Chandigarh were actively participating in marketing and propagating the project, in question. They were dealing with the complainants throughout, by receiving their letters qua progress at the spot and also accepted payment made through cheques. In view of above, objection raised in this regard, stands rejected.”
In view of above, objection taken by opposite parties no.1, 3 and 4, in this regard, therefore, being devoid of merit, must fail, and the same stands rejected.
Another objection taken by opposite parties no.1, 3 and 4, with regard to pecuniary jurisdiction of the Commission, also deserves rejection. It may be stated here, as stated above, that the complainant has sought refund of amount of Rs.42,07,930/- (infact Rs.40,12,930/-) alongwith interest @18% p.a. from the respective dates of deposits; Rs.5 lacs, as compensation for mental agony; physical harassment; deficiency in providing service; adoption of unfair trade practice etc.; and cost of litigation to the tune of Rs.55,000/-, aggregate value whereof fell above Rs.20 lacs and below Rs.1 crore. In no way, aggregate value of the reliefs claimed, exceeds Rs.1 crore. Thus, this Commission has got pecuniary Jurisdiction, to entertain and decide the complaint. The objection taken by opposite parties no.1, 3 and 4, that this Commission lacks pecuniary Jurisdiction, being devoid of merit, must fail and the same stands rejected.
It is not in dispute that the opposite parties have failed to deliver possession of the unit, in question, within the stipulated period or even as on today. The complainant has sought refund of the amount paid, alongwith interest and compensation etc. It is to be analyzed as to whether, in view of facts noted above; pleadings on record and arguments raised, it is open to the complainant, to claim above said reliefs or not. It is not in dispute that the complainant purchased the unit, in question, vide Agreement dated 08.02.2011. Constructed unit was sold in favour of the complainant, for an amount of Rs.40,71,150/-, which includes basic sale price, external development charges etc. In all, the complainant has paid an amount of Rs.40,12,930/-, towards price of the said unit. As per condition no. 4.a.(i) of the Agreement, possession of the fully constructed unit, in a developed project, was to be delivered to the complainant within a period of 36 months, from the date of execution of the same (Agreement), subject to force majeure conditions i.e. on or before 07.02.2014. As stated above, before delivery of possession of the unit, in question, as per condition no.4.b. of the Agreement, it was incumbent upon the opposite parties, to give notice to the complainant, in case of delay in handing over possession of the unit, beyond the period of 36 months, subject to force majeure circumstances. It was further provided in condition no.4.c.ii) in the Agreement that penalty @Rs.5/- per square feet, per month of the super area of the unit, for the period of delay in delivery of possession thereof shall be paid by the opposite parties, to the complainant. The due date of offer of possession of the unit i.e. 07.02.2014 already stood expired.
Contention of Counsel for the complainant that construction at the spot is not complete needs acceptance. By the date, when arguments were addressed before us, possession has not been offered to the complainant. It is not a case of the opposite parties that possession of the unit was ready to be delivered by the stipulated date, but the complainant has refused to come forward to accept the same (possession). Rather, at the time of arguments, Counsel for opposite parties no.1, 3 and 4 failed to give any positive date/time, as to when, possession of the constructed unit will be given. It was vocally said that possession of the unit, is ready to be delivered but occupation/completion certificate is awaited. Qua this very project, in a large number of cases, it has been found as a matter of fact that construction has come to stand still. As stated above, even at the time of arguments, no commitment was made to deliver possession of the unit, in near future.
Even otherwise, not even a single convincing document has been placed on record, by opposite parties no.1, 3 and 4 to prove that the unit, in question, is habitable or that the development at the project is complete in all respects. It is well settled law that the onus to prove that the project has been completed and the area/site, in question, is fully developed, is on the builder/opposite parties. It was so said by the National Commission, in Emaar MGF Land Limited and another Vs. Krishan Chander Chandna, First Appeal No.873 of 2013 decided on 29.09.2014. In the present case, it is very strange that not even a single document has been placed on record, by opposite parties no.1, 3 and 4, in respect of the unit, in question, to prove that the construction is complete and they are actually ready for offer and delivery of possession. In case, all the development activities had been undertaken and construction of the units is complete at the project site, then it was for the opposite parties, which could be said to be in possession of the best evidence, to produce cogent and convincing documentary evidence, in the shape of the reports and affidavits of the Engineers/Architects, as they could be said to be the best persons, to testify, as to whether, all these development and construction activities, had been undertaken and completed at the site or not, but they failed to do so. At the same time, opposite parties no.1, 3 and 4 were also required to produce on record, a copy of the occupation and partial/final Completion Certificates (if obtained), having been issued by the Competent Authorities, which could be said to be best evidence, to prove their case, but they miserably failed to do that also. Mere placing on record an application dated 03.02.2016, allegedly sent to the Competent Authorities, seeking partial completion certificate in respect of the project, in question, is of no help to the opposite parties.
Under these circumstances, it can be said that there is a material violation on the part of the opposite parties. At the same time, it is also a settled law that when there is a material violation on the part of the builder, in not handing over possession of the unit(s) by the stipulated date, the purchaser is not bound to accept the offer, if the same is made at a belated stage and on the other hand, can seek refund of amount paid. It was so said by the Hon’ble National Commission, in a case titled as Aashish Oberai Vs. Emaar MGF Land Limited, Consumer Case No. 70 of 2015, decided on 14 Sep 2016, wherein, under similar circumstances, while negating the plea taken by the builder, it was held as under: -
“I am in agreement with the learned senior counsel for the complainants that considering the default on the part of opposite parties no.1 and 2 in performing its contractual obligation, the complainants cannot be compelled to accept the offer of possession at this belated stage and therefore, is entitled to refund the entire amount paid by him along with reasonable compensation, in the form of interest.”
Not only as above, in a case titled as Brig Ajay Raina (Retd.) and another Vs. M/s Unitech Limited, Consumer Complaint No.59 of 2016, decided on 24.05.2016, wherein possession was offered after a long delay, this Commission, while relying upon the judgments rendered by the Hon`ble National Commission, ordered refund to the complainants, while holding as under:-
“Further, even if, it is assumed for the sake of arguments, that offer of possession, was made to the complainants, in July 2015 i.e. after a delay of about three years, from the stipulated date, even then, it is not obligatory upon the complainants to accept the same.
Furthermore, in another case titled as M/s. Emaar MGF Land Ltd. & Anr. Vs. Dr.Manuj Chhabra, First Appeal No.1028 of 2015, decided on 19.04.2016, the Hon’ble National Commission, under similar circumstances, held as under:-
“I am of the prima facie view that even if the said offer was genuine, yet, the complainants was not obliged to accept such an offer, made after a lapse of more than two years of committed date of delivery”.
However, in the present case, as stated above, possession of the unit, has not even been offered, what to speak of delay in offering thereof. Under these circumstances, it is held that since there was a material violation on the part of the opposite parties, in not offering and handing over possession of the unit by the stipulated date or by the time, this complaint was filed, the complainant is, thus, entitled to get refund of amount actually deposited by him. In view of above facts of the case, the opposite parties are also under an obligation to compensate the complainant, for inflicting mental agony and causing physical harassment to him, as also escalation in prices.
No doubt, a plea was also taken by opposite parties no.1, 3 and 4, that delay aforesaid, is attributable to the PSPCL and GMADA, as they took a long time to grant approval for supply of electricity to the project. It may be stated here that mere bald plea taken by opposite parties no.1, 3 and 4 has no legs to stand. To substantiate their stand, the opposite parties were required to place on record cogent and convincing evidence on record, to convince this Commission that despite the fact that every step was taken at their end, but the said Authorities delayed the matter, unnecessarily leading to delay in completing the project. Had this been actually the case of the opposite parties, they would have definitely taken up the matter with the Competent Authorities, by sending letters followed by reminders, to grant timely approval with regard to provision of electricity to the project. However, no such, documents are on record. As such, it can very well be said that such a plea has been taken by opposite parties no.1, 3 and 4, just with a view to evade their liability. Under these circumstances, no help, therefore, can be drawn by opposite parties no.1, 3 and 4, from Clause 8 (b) of the Agreement, relating to force majeure circumstances, as far as the present case is concerned. The complainant is certainly entitled to get refund of the amount actually deposited by him, towards price of the said unit, as held above.
An objection was also raised by opposite parties no.1, 3 and 4 that the dispute being related to contractual nature, the consumer complaint is not maintainable, and only a Civil Court can decide the case. It may be stated here, that the complainant hired the services of the opposite parties, for purchasing the unit, in the manner, referred to above. According to condition no.4.a.(i) of the Agreement, physical possession of the unit, was to be delivered by the opposite parties, within a period of 36 months, from the date of execution of the same (Agreement) i.e. latest by 07.02.2014 alongwith all basic amenities as mentioned in Article 2.a.(ii) of the Agreement. By not doing so, the opposite parties have breached the terms and conditions of the said agreement, leading to deficiency in providing service and adoption of unfair trade practice. Section 2 (1) (o) of the Act, defines service as under:-
“service” means service of any description which is made available to potential users and includes, but not limited to, the provision of facilities in connection with banking, financing insurance, transport, processing, supply of electrical or other energy, board or lodging or both, housing construction, entertainment, amusement or the purveying of news or other information, but does not include the rendering of any service free of charge or under a contract of personal service”
From the afore-extracted Section 2(1)(o) of the Act, it is evident that housing/construction, also comes within the definition of a service. In Narne Construction P. Ltd., etc. etc. Vs. Union Of India and Ors. Etc., II (2012) CPJ 4 (SC), it was held that when a person applies for the allotment of a building or site or for a flat constructed by the Development Authority and enters into an agreement with the Developer, or the Contractor, the nature of transaction is covered by the expression ‘service’ of any description. Housing construction or building activity carried on by a private or statutory body constitutes ‘service’ within the ambit of Section 2(1)(o) of the Act. Similar principle of law, was laid down, in Haryana Agricultural Marketing Board Vs. Bishambar Dayal Goyal & Ors. (AIR 2014 S.C. 1766). Under these circumstances, the complaint involves the consumer dispute, and the same is maintainable. Not only this, Section 3 of the 1986 Act, provides an alternative remedy. Even if, it is assumed that the complainant has a remedy to file a suit, in the Civil Court, the alternative remedy provided under Section 3 of the Act, can also be availed of by him, as he falls, within the definition of consumer. In this view of the matter, objection taken by opposite parties no.1, 3 and 4, in this regard, being devoid of merit, must fail, and the same stands rejected.
Such type of objection taken by opposite parties no.1, 3 and 4 is also bereft of merit, in view of latest judgment passed by the Hon’ble National Commission, titled as M/s. Karwa Developers & 3 Ors. Vs. Shree Vinayak Co-Operative Housing Society Ltd. & 3 Ors., First Appeal No. 980 of 2016, decided on 3rd March, 2017, wherein, a similar plea of the builder was negated, while holding as under:-
“We also do not find any substance in the plea taken by the appellant that under clause 14(a) of the development agreement, the complainant was required to file a civil suit under the Specific Relief Act only, because they were asking for monetary relief. The State Commission rightly stated that the relief sought in the complaint were on account of deficiencies committed by the OP Developers, vis-à-vis, the society. Since there is a specific clause in the agreement for giving the possession of the flat within specific time frame and penalty has been provided if the developers failed to develop the same, the society was well within its rights to file consumer complaint against the OP builder.”
It is to be further seen, as to whether, interest on the amount refunded, can be granted in favour of the complainant. It has been admitted by both the parties, that, actually, an amount of Rs.40,12,930/-, was paid by the complainant. Against payment of that amount, the complainant is still empty handed. The said amount has been used by the opposite parties, for their own benefit. There is no dispute that for making delayed payments, the opposite parties were charging heavy rate of interest (compounded quarterly @18% per annum) as per Article 2.c. of the Agreement, for the period of delay in making payment of instalments. It is well settled law that whenever money has been received by a party and when its refund is ordered, the right to get interest follows, as a matter of course. The obligation to refund money received and retained without right implies and carries with it, the said right. It was also so said by the Hon`ble Supreme Court of India, in UOI vs. Tata Chemicals Ltd (Supreme Court), (2014) 6 SCC 335 decided on March 20th, 2014). In view of above, the complainant is certainly entitled to get refund of the amount deposited by him, alongwith interest @15% compounded quarterly, (less than the rate of interest charged by the opposite parties, in case of delayed payment i.e. 18% compounded quarterly, as per Article 2.c. of the Agreement), from the date, when the amount was actually deposited, till realization.
It may be added here that the complainants in all the three complaints are original allottees. However, in consumer complaint bearing no.480 of 2017, since complainant no.2 i.e. Mr.Vijay Kumar Garg (husband of complainant no.1), had expired on 15.02.2011 (as evident from his death certificate placed on record at page 21), his legal heirs i.e. his daughters namely Navya Garg and Urvee Garg, have also been impleaded as necessary parties to the complaint, who have submitted their separate affidavits to the effect that the amount so deposited towards respective unit, be released in favour of their mother i.e. complainant no.1 only. Under above circumstances, we are of the considered opinion that in view of undertaking given by the said legal heirs of complainant no.2 (now deceased), by way of their affidavits, if amount deposited in respect of the unit, in question, in the said consumer complaint, is ordered to be released in favour of complainant no.1, that will cause no prejudice to the opposite parties.
Furthermore, in this complaint only, a petty dispute with regard to date of execution of the agreement has also been highlighted by the Company/Unitech Limited. As per the complainants, the Agreement in respect of the unit therein, was executed on 10.03.2010, whereas, as per the Company/Unitech Limited, it was done only on 08.12.2010. We have gone through the copies of Agreements placed on record by the respective parties and are of the considered opinion that the Agreement in the said complaint was executed only on 08.12.2010, which date is also found mentioned on the Agreement placed on record by Unitech Limited, against which, the Agreement placed on record by the complainants, reveals that the column meant for date of execution is blank. However, whatever the case may be, in this case also, it is an admitted fact that possession of the unit concerned, has not been offered to the complainants, despite the fact that the same was to be delivered in 2013. Therefore, at this stage, whether the Agreement was executed on 10.03.2010 or on 08.12.2010, has no significance, especially when the complainants have sought refund of the deposited amount.
As far as the plea taken by opposite parties no.1, 3 and 4 regarding forfeiture of earnest money is concerned, it may be stated here that the same stands rejected, because it is not their (opposite parties) case, that they were ready with possession of the unit, to be delivered to the complainant, by the stipulated date but the complainant wanted to rescind the contract, on account of some unavoidable circumstances/financial constraints or for any personal reason, and is seeking refund of the amount deposited. Had this been the case of the opposite parties, only in those circumstances, it would have been held that since the complainant himself is rescinding the contract, as such, he is entitled to the amount deposited, after deduction of the earnest money, as per law. In this view of the matter, the plea taken by opposite parties no.1, 3 and 4, in this regard, has no legs to stand and is accordingly rejected.
The next question, that falls for consideration, is, as to whether, the complaint filed by the complainant, was within limitation or not. It may be stated here that since, as stated above also, it is an admitted case that offer of possession of the unit, in question, could not be made till date for want of completion of construction and basic amenities, and on the other hand, amount deposited was also not refunded to the complainant alongwith interest, as such, there is continuing cause of action, in his favour, in view of principle of law laid down, in Lata Construction & Ors. Vs. Dr. Rameshchandra Ramniklal Shahand Anr., II 2000 (1) CPC 269=AIR 1999 SC 380 and Meerut Development Authority Vs. Mukesh Kumar Gupta, IV (2012) CPJ 12 (SC). Under these circumstances, it is held that the complaint is not at all barred by limitation. The submission of Counsel for opposite parties no.1, 3 and 4, in this regard, being devoid of merit, must fail, and the same stands rejected.
As far as the liability of opposite parties no.1, 3 and 4, including opposite party no.2 is concerned, it may be stated here that once it has been proved on record that the Company i.e. Unitech Limited was a necessary party to the Agreement; it also marketed the project, in question; and had also admittedly received substantial amount, from the complainant, towards the said unit, as such, they (opposite parties no.1, 3 and 4) are equally liable alongwith opposite party no.2 and also opposite parties no.5 and 6/Alice Developers Private Limited, to refund the amount paid by him (complainant). The objection raised by opposite parties no.1, 3 and 4 to the effect that they being facilitator or confirming parties and were having a limited role, are not liable to refund the amount paid by the complainant, alongwith opposite parties no.5 and 6, being devoid of merit, stands rejected.
An objection was also taken by Counsel for opposite parties no.1, 3 and 4 that opposite party no.4 being Managing Director/Director was wrongly impleaded as a necessary party, in his personal capacity. We do not agree with the objection raised. A similar question fell for determination before the Hon’ble National Commission, in a case titled as M/s. India Bulls Real Estate & Wholesale Services Ltd. & Ors, Vs. Vemparala Srikant & Anr., First Appeal No. 797 of 2017, decided on 16 Aug 2017, wherein, it was held as under:-
“From the material on record, it is evident that the OP-2 is the Chairman of the Company whereas the OP-3 is the Chief Executive Officer-cum-M.D. of the said company. Evidently, these two persons are holding such important positions in the Company, where they are directly involved with the decision-making process in the company. By virtue of their office, they can directly influence any decision regarding relief to be granted to the complainant, as asked for in the consumer complaint. It is held, therefore, that the State Commission has rightly dismissed the interim application, rejecting the plea of the appellants to delete the name of OP-2 & OP-3 from the array of parties. The impugned order passed by the State Commission is, therefore, upheld and the appeal is ordered to be dismissed with no order as to costs.”
In view of above, objection raised by Counsel for opposite parties no.1, 3 and 4 stands rejected.
No other point, was urged, by the contesting parties, in the cases, referred to above.
For the reasons recorded above, all the three complaints are partly accepted, with costs, in the following manner:-
Consumer complaint no. 469 of 2017. The opposite parties are jointly and severally directed as under:-
To refund, to the complainant, the amount of Rs.40,12,930/-, alongwith interest @15% compounded quarterly, from the respective dates of deposits onwards.
To pay compensation, in the sum of Rs.1.50 lacs, for causing mental agony and physical harassment, to the complainant, as also escalation in prices.
To pay cost of litigation, to the tune of Rs.33,000/- to the complainant.
Consumer complaint no. 480 of 2017. The opposite parties are jointly and severally directed as under:-
To refund, to complainant no.1, the amount of Rs.29,31,912/-, alongwith interest @15% compounded quarterly, from the respective dates of deposits onwards.
To pay compensation, in the sum of Rs.1 lac, for causing mental agony and physical harassment, to complainant no.1, as also escalation in prices.
To pay cost of litigation, to the tune of Rs.33,000/- to complainant no.1.
However, it is made clear that, if, at later stage, any dispute arises, with regard to rising of any other legal heirs, as far the amount so released to complainant no.1 is concerned and if it is proved that the same has been got released by misleading facts, she (complainant no.1) alongwith her legal heirs, referred to above, which probably will give rise to a civil dispute, shall face the consequences, as per law.
Consumer complaint no. 579 of 2017. The opposite parties are jointly and severally directed as under:-
To refund to the complainant, the amount of Rs.39,81,239/-, alongwith interest @15% p.a., (as prayed), from the respective dates of deposits onwards.
To pay compensation, in the sum of Rs.1.50 lacs, for causing mental agony and physical harassment, to the complainant, as also escalation in prices.
To pay cost of litigation, to the tune of Rs.33,000/- to the complainant.
The payment of awarded amounts mentioned at sr.nos.(i) to (iii), in consumer complaints bearing no.469 of 2017 and 480 of 2017 shall be made, within a period of 02 (two) months from the date of receipt of a certified copy of this order, failing which, the amount mentioned at sr.no.(i) shall further carry penal interest @18% compounded quarterly, instead of 15%, from the date of filing of this complaint and interest @15% compounded quarterly, on the amounts mentioned at sr.nos.(ii) and (iii), from the date of filing of respective complaint(s), till realization.
Similarly, the payment of awarded amounts mentioned at sr.nos.(i) to (iii), in consumer complaint bearing no.579 of 2017 shall also be made, within a period of 02 (two) months from the date of receipt of a certified copy of this order, failing which, the amount mentioned at sr.no.(i) shall further carry penal interest @18% p.a., instead of 15% p.a., from the date of filing of this (579 of 2017) complaint and interest @15% p.a., on the amounts mentioned at sr.nos.(ii) and (iii), from the date of filing of this (579 of 2017) complaint, till realization
However, it is made clear that, if the complainant(s), in above cases, have availed loan facility from any banking or financial institution, for making payment of installments towards the said unit, it will have the first charge of the amount payable, to the extent, the same is due to be paid by them (complainants).
Certified copy of this order be placed on the connected complaint files, referred to above.
Certified copies of this order be sent to the parties, free of charge.
The file be consigned to Record Room, after completion.
Pronounced.
11 Dec. 2017
Sd/-
[JUSTICE JASBIR SINGH (RETD.)]
PRESIDENT
Sd/-
(DEV RAJ)
MEMBER
Sd/-
(PADMA PANDEY)
MEMBER
Rg.