Sri S.K.Sahoo,President.
This is a complaint filed by the complainant Soumendra Pradhan U/s. 35 of C.P.Act, 2019 for certain reliefs against the opp.parties.
2. The case of the complainant is that on 07.05.2021 he took a new connection to his house supplied by the TPCODL vide consumer No. 80022189650 bearing meter Sl.No. TS 146394. The status of the meter was Zero unit. On 12.02.2022 a electric bill was supplied to him, in which the date of installation of the new meter was shown as 25.12.2021 instead of actual installation date 07.05.2022. The status of the said meter was shown as 1104 units. No previous bill was supplied to the complainant as required under law. The opp.parties illegally calculated different charges and the bill amount was Rs.6722.36 with arrear shown as Rs.2660.00. The complainant approached the opp.parties repeatedly for correction of the mistake appeared in the bill supplied to him. The opp.parties did not take any step for correction of the mistake. So on 15.02.2022 the complainant lodged a complaint before the opp.party No.3 for revision. No further communication was received from opp.party No.3.
Again on 13.03.2022 another electric bill was supplied to the complainant by opp.party No.3 & 4. In the said bill the status of the meter was shown as 1194 units i.e 90 units consumed .Again in the said bill the opp.party No.3 & 4 has given a wrong calculation and the total amount imposed on the complainant was Rs.9827.09 paisa. The complainant raised his complaint against such in correct bill. As no action was taken by the opp.parties for revision of the electric bills supplied to the complainant, this complaint is filed before the Commission.
3. Notices were issued to all the opp.parties through Regd. post with A.D on 24.08.2022. The complainant submitted the track consignment report relating to the notices issued to the opp.parties. On perusal of the documents available on the record it is clear that notices were served on all the opp.parties. The opp.party No.2 appeared and filed a written statement on behalf of all the opp.parties.
The case of the opp.party No.2 is that initially there was power supply to the house of the complainant vide consumer account No. 03900439/80022189650. It was a domestic connection with connected load 1K.W since 07.05.2021. Annexure-1 is the photo copy of the billing abstract. The first bill was generated during 8/2020-2021 on estimated basis and continued upto 02/2022.During March, 2022 the energy bill was served on the complainant on actual meter reading basis with initial meter reading as 1104 units. The outstanding dues upto 03/2022 as per data base was 9050 units. Thereafter, from March, 2022 onwards the electric bills were issued to the complainant as per the actual consumption and meter reading. After receiving the complaint from the complainant the electric bill from 07.05.2022 to 12.02.2022 has been revised as per the actual meter consumption by taking the total consumption as 1104 units from 05/2021 to 02./2022. The average meter reading was calculated as 110.40 units per month from 05/2021 to 02/2022 and an amount of Rs.4841.72 has been withdrawn. Further the DPS amounting Rs.628.29paisa claimed from 08/2021 to 08/2022 has also been withdrawn . Annexure- 2 is the photo copy of the revised statement. The total withdrawal amount was Rs.5470.01 paisa which has been credited to the account of the consumer in the month of August, 2022 by the Section Officer. With reference to the amount of Rs.73219.71 paisa which was charged has been debited under sundry adjustment (adjustment against faulty meter) in the bill issued on 14.08.2022 . The opp.parties has been rectified the said amount as per the standard operating procedure and the same amount has been credited to the consumers’ account, which is shown in Annexure-3. The bill revision has been done as the consumer has got a new connection on 07.05.2021 through the meter number TSO-106394 and the said meter exists in the residential house of the complainant now. The copy of the meter installation report dtd. 07.05.2021 is annexure- 4. There is absolutely no negligence and there is no deficiency in service provided by the opp.parties to the complainant. The opp.parties denied the other allegations made in the complaint. The complaint filed by the complainant be rejected.
4. The complainant in his complaint petition has alleged that there is a new connection to his residential house by the opp.parties on 07.05.2021 bearing Consumer No. 80022189650 having meter Sl. No. TSO 146394 with reading zero unit. It is further alleged that on 12.02.2022 the first electric bill was supplied to the complainant in which the date of installation of the meter was shown as 25.12.2021 instead of 07.05.2021. Perused the meter changed report dtd.07.05.2021 which was issued to the complainant by the opp.parties. On perusal of the said report it is clear that a new connection was given to the complainant only on 07.05.2021. The opp.parties filed their written statement through opp.party No.2 .At paragraph-1 of the show cause it is admitted by the opp.parties that a new domestic electric connection was supplied to the complainant on 07.05.2021 having account number 03900439/80022189650. From Annexure- 1 it appears that there was no meter reading from date of installation of the meter upto 07/2021. The Annexure- 1 shows the detail calculation of the unit charge amount demanded from the complainant. Annexure- 2 &3 also shows the amount of money adjusted by the opp.parties and deposited in the consumer account of the complainant. The opp.parties have adjusted all the amounts which were due to the opp.parties and deposited the surplus amount in the consumer account of the complainant by means of adjustment. Soon after receipt of the complaint from the complainant the opp.parties have taken prompt action and adjusted the amount. Although it is alleged by the complainant that he has approached to the opp.parties in several occasions regarding the defects in the bills issued by the opp.parties, he has not produced any evidence before this Commission to prove the same. The complainant failed to prove that on 15.02.2022 he has submitted a letter to S.D.O Electrical ,Talcher. However, in the case in hand soon after receipt of the complaint the opp.parties have taken all the necessary steps for revision of the energy bill and withdrawn the amounts and deposited the same in the consumer account of the complainant. So there is no deficiency in service by the opp.parties as they have promptly acted on the complaint.
5. Hence order:-
: O R D E R :
The case be and the same is dismissed on contest against the opp.parties.