A.P. STATE CONSUMER DISPUTES REDRESSAL COMMISSION
HYDERABAD.
F.A.Vijayawada
Between:
1) KrishnaS/o. Late
2)
W/o.KrishnaBoth R/o.
Guntur Road, Macherla
Guntur. The United
Rep. by its Branch Manager
Divisional Office-II, Upstairs
Andhra Bank, Patamata
Vijayawada-10, Krishna Dist.
Counsel for the Appellant:
Counsel for the Resp:
F.A.Vijayawada
Between:
The United
Rep. by its Branch Manager
Divisional Office-II, Upstairs
Andhra Bank, Patamata
Vijayawada-10, Krishna Dist.
1) KrishnaS/o. Late
2)
W/o. KrishnaBoth R/o.
Guntur Road, Macherla
Guntur.
Counsel for the Appellant:
Counsel for the Resp:
CORAM:
HON’BLE SRI JUSTICE D. APPA RAO, PRESIDENT
&
MONDAY, THIS THE TWENTY FIRST DAY OF FEBRUARY TWO THOUSAND ELEVEN
Oral Order: (Per Hon’ble Justice D. Appa Rao, President)
1)These cross-appeals F.A. 940/2009
2)
3)
4) Rs. 7 lakhs to get their building repaired which was damaged due to heavy rainfall. Opinion of the surveyor is final.
5)
6)
7) who is at Rs. 6,40,000/- is on higher side.
8) claim of Rs. 40,000/- and interest @ 18% p.a.,
9)
10)
Less: Less: Policy excess Net loss
Contrarily Estimation cost of the wood work, polish, repair work of civil and electrification
S.No | Description of the work | Quantity | Rate | Amount |
| | | | |
1 | R.R. masonary (1:6) cm 21.05 cum | 870/ | 33048.50 |
| basement level | | cum | |
| | | | |
2 | Brick masonary (1:5) | | | |
| super structure of compound wall | 16.72 cum | 1749/ | 35931.28 |
| | | cum | |
| | | | |
3 | Plastering with | 111.51 | 1039/ | 11585.89 |
| thick | sqm | 10sqm | |
| | | | |
4 | Fine polished stone flooring | 98.12 | 10278/ | 100847.74 |
| with 20mm thick (1:3) sqm | 10sqm | |
| for side of the rooms | | | |
| | | | |
5 | Existing sanitary | | LS | 20000.00 |
| | | | |
6 | Existing bath room | | LS | 35000.00 |
| tiles (3 bath rooms) | | | |
| | | | |
7 | Existing paint with | | LS | 30000.00 |
| | | | |
| | | | |
8 | Unforeseen items | | LS | 3586.00 |
| | | | |
9 | Wood work (rose wood, teak wood, | | LS | 320000.00 |
| polishing) | | | |
| | | | |
10 | Electrification work (wiring, switches, | | LS | 50000.00 |
| fuses, motor starter, labour etc) | | | |
| | | | |
| Total | | | 640000.00 |
11) estimate.
12) documents furnished by them lest he would un-necessarily suffer.
13) suffered damage PW3 immediately
14)
1)PRESIDENT
2) MEMBER
Dt.
*pnr
“UP LOAD – O.K.”